the operation

Converting a small upstairs bedroom into a modern spa, very carefully.

The downstairs:

037038

.

.

…………………………………………….

…………………………………………………………………………………………………………………………………………………………………………………………..And And the project overhead, floors opened up, upper surface of downstairs ceilings exposed, these channels will accommodate the water and soil tubes and much of the wiring:
updown 002.updown 010
.

…………………………………………………………………………………………………………………………………………………………………………………………………………………Rough Rough openings for lights and vent fans above:

.updown 006

 

.

……………………………………………………………………………………………………………………………………………………………………………………..And And above all, the attic:

.025

………………………………………………………………………………………………………………………………………………………………………………………Main Main upstairs hall is sealed for dust protection, access to project is through narrow back stairway. Around 2 tons of lath, plaster and misc. debris have exited so far, carried in 35 gallon tubs @ 100 lbs each.

.029030